TT0339 Gilbert Rd September 2023 Construction Update

Описание к видео TT0339 Gilbert Rd September 2023 Construction Update

The Maricopa County Department of Transportation, in cooperation with the Salt River Pima-Maricopa Indian Community (SRPMIC) and the City of Mesa, is constructing a new bridge over the Salt River.

The new four-lane Gilbert Road Bridge will replace the existing two-lane bridge and low water crossing, which can become flooded during high water flows in the Salt River. Located on Gilbert Road between Thomas Road and State Route 87 (Beeline Highway), the bridge will be built in phases and provide two northbound and two southbound lanes.

Gilbert Road Bridge construction is anticipated to be completed in summer of 2024.

Комментарии

Информация по комментариям в разработке